# Consumer unit replacement in Ferndown

> Fuse board replacement in Ferndown at Tricketts Cross, BH22. Earth and bonding are confirmed, then MX2 Electrical tests each circuit. TrustMark registered.

MX2 Electrical confirms earth and bonding at the cupboard during fuse board replacement in Ferndown, then hands the homeowner test results covering all circuits from that new board.


## Fuse board replacement pricing

The cost of a consumer unit replacement depends on the size of the board, the number of circuits present, and whether the installation requires single-phase or three-phase equipment.
- Consumer unit replacement: from £500
- The price covers isolating the power, fitting the new metal enclosure, landing circuits, and full dead and live testing.
- Costs vary based on the number of usable ways, whether three-phase distribution is needed, and any required meter tail upgrades.
- Labour on ad hoc electrical tasks is charged at our standard hourly rate, with larger project work priced before work begins.

## Consumer unit replacement across Ferndown

We serve Ferndown from our base in Poole.
- Ferndown town centre
- Tricketts Cross
- West Parley
- BH22

## What happens on the day

Replacing a consumer unit requires an organised visit where power is safely switched off, old components are removed, and every circuit is reconnected and checked.

### Incoming supply isolation

We isolate the electrical supply at the meter, verify that incoming meter tails are dead, and record the layout of all existing circuits before dismounting the old enclosure.

### Enclosure mounting and circuit landing

The existing fuse box is taken down and the new metal consumer unit is secured in position. Incoming meter tails, earthing conductors and protective bonding are connected, followed by each sub-circuit onto its miniature circuit breaker and residual current device.

### Testing and circuit identification

Every circuit is checked using calibrated instruments for insulation resistance, earth continuity and trip times. We mark the lid clearly with circuit designations and restore power.

## Frequently asked questions about fuse board replacements


### How long will the electricity be turned off during the replacement?

The main electrical supply must be isolated while the old board is removed and the new consumer unit is connected. For most standard residential properties, this process takes several hours. We restore power circuit by circuit once each connection is terminated and tested, keeping disruption to a minimum.

### Do I have to replace my fuse board if an EICR flags it?

An Electrical Installation Condition Report may identify an older fuse box as lacking residual current devices, having wooden backing, or showing heat damage. While remedial work is always your choice, upgrading the consumer unit resolves these safety observations and helps achieve a satisfactory report.

### Will the new consumer unit fit in the existing meter cupboard?

Modern metal consumer units often have different physical dimensions compared to vintage fuse boxes. In most situations, the new board fits neatly within the existing cupboard space, though we confirm whether any repositioning is required before beginning work.

### What certificates do I receive once the new board is installed?

Because replacing a consumer unit is notifiable electrical work, we register the completed installation through NAPIT. You receive an Electrical Installation Certificate detailing the test results and a notification confirmation for building regulations.

### Can a new fuse board accommodate an EV charger or electric shower?

Yes, upgrading to a larger modern board is often the ideal solution when adding high-powered appliances. We calculate the required capacity and ensure sufficient spare ways are available with matching circuit breakers and protective devices.

## Other services in Ferndown

- [Electrician in Ferndown](https://mx2-electrical-ltd.co.uk/electrician-ferndown): Domestic, commercial and selected industrial electrical repairs, testing and installation work across Ferndown, West Parley and BH22.
- [Consumer unit replacement (all areas)](https://mx2-electrical-ltd.co.uk/services/fuse-board-replacement): MX2 Electrical replaces fuse boards and consumer units around Poole and Bournemouth. New board, marked circuits and a completion record from £500.
- [EV charger installation in Ferndown](https://mx2-electrical-ltd.co.uk/electrician-ferndown/ev-charger-installation)
- [Lighting Installation in Ferndown](https://mx2-electrical-ltd.co.uk/electrician-ferndown/lighting-installation)
- [House rewiring in Ferndown](https://mx2-electrical-ltd.co.uk/electrician-ferndown/house-rewiring)
- [Industrial electrical projects and maintenance in Ferndown](https://mx2-electrical-ltd.co.uk/electrician-ferndown/industrial-electrical-projects-maintenance)
- [EICR in Ferndown](https://mx2-electrical-ltd.co.uk/electrician-ferndown/eicr)
- [Electric motor installation and repair in Ferndown](https://mx2-electrical-ltd.co.uk/electrician-ferndown/three-phase-motor-installation-repair)

## Business facts
- Service area: Poole, Bournemouth, Broadstone, Wimborne Minster, Wareham, Upper Parkstone, Ferndown, Christchurch, Canford Heath, Westbourne
- Hours: Calls answered 24/7
- Phone: +447397844504
- Email: info@mx2-electrical-ltd.co.uk
- Qualifications: NVQ Level 3, City & Guilds; Gold Card Electrician
- Pricing rules: Current labour rate: £70 per hour.; Materials, specialist equipment and larger project work are confirmed separately before they go ahead.

## Book Now
- [Book Now](https://mx2-electrical-ltd.co.uk/#chat): Send the job details and request a quote from MX2 Electrical.

## Sitemap
- [Full sitemap](https://mx2-electrical-ltd.co.uk/sitemap.md): Complete machine-readable page directory.