Electric motor installation and repair in Broadstone
MX2 Electrical carries out Motor installation and repair in Broadstone, then tests the motor circuit and leaves a certificate where the work needs one.
Calls answered 24/7
- 2 years trading
Transparent rates for motor installation and repair
We quote work clearly without hidden charges. Our hourly labour rate applies on site, with replacement machinery and specialist parts priced separately before work proceeds.
From £70 an hour
from £70 an hour
Included when agreed
- Inspection of the motor, starter, isolator and supply
- Isolation of the circuit before any work starts
- Fitting of a new single or three phase motor
- Repair of windings, bearings, couplings or terminals where that is the right job
- Testing of the motor circuit and a certificate where the work needs one
Ways to pay


- Pay by bank
- Bank transfer
- Labour is billed using our standard hourly rate for the time spent testing, removing, fitting and commissioning the motor.
- The overall cost varies depending on whether the existing motor can be repaired on site or requires a replacement unit.
- Motor power ratings, single or three phase supply requirements, replacement starters, and cable run lengths determine materials pricing.
- Full costs for replacement parts and additional electrical hardware are explained and confirmed before anything is ordered.
- Current labour rate: £70 per hour.
- Materials, specialist equipment and larger project work are confirmed separately before they go ahead.
Electric motor installation and repair across Broadstone
We serve Broadstone from our base in Poole.
What happens on the day
Every motor repair or replacement follows a structured sequence to safeguard equipment, verify electrical characteristics and return machinery to service without delay.
- Safe isolation and mechanical inspectionWe identify the dedicated circuit at the distribution board, isolate the power supply and lock it off safely. We inspect the motor nameplate ratings, mounting brackets, drive belts, couplings and starter gear before dismantling any connections.
- Electrical testing and fault diagnosisUsing calibrated test instruments, we measure insulation resistance between windings and to earth, test phase-to-phase continuity on three phase units, and evaluate starter capacitors on single phase units to establish exactly why the motor failed.
- Motor installation or on-site repairWe complete on-site terminal replacements, bearing swaps or internal winding connections where appropriate, or mechanically unbolt the failed motor to mount a new unit. We align the shafts, secure all mountings and terminate power conductors to the terminal block.
- Functional testing and documentationPower is restored to observe starting current, running current, operating temperature and correct shaft rotation. When installation work involves new circuits or altered distribution boards, appropriate certification is generated.
How booking works
Tell us about the job
Tap Book Now and describe the work in the chat. Photos help.
Get your price
You see your price in the chat. A set price is paid at checkout; any other job is quoted first.
Choose your visit
Give your address and when you are free, and the visit is arranged.
Follow your job from booking to receipt
See when we're on our way, get your job report the moment we finish, and pay in seconds.
Track us on our way
See us on the map with a live arrival time.
Your job report, same day
See exactly what was done as soon as we finish.
Invoice and receipt in one place
Pay online in seconds, and your receipt is always there when you need it.
Why choose MX2 Electrical
You see the price before you call
Starting prices for the common jobs are published on this site, not held back until someone visits.
Registered work, certificated properly
MX2 Electrical is NAPIT registered, and notifiable work is notified through that registration.
The fault gets found before the repair gets priced
Testing establishes what is actually wrong rather than replacing parts in sequence.
- Reviews
- 101
- Rating
- 4.9
- Trading since
- 2024
“With over 20 years in the trade behind us, we are a fully qualified, NAPIT registered team covering Poole and the Dorset area, domestic and commercial. We turn up when we say we will, explain what needs doing before we do it, and leave the place as we found it.”
Mohsen Nazari, MX2 Electrical
Book NowPhotos of our work
Do you work on both single phase and three phase motors in Broadstone?
Yes. We inspect, repair and replace single phase motors used in domestic appliances, booster pumps and garage doors, as well as heavy-duty three phase motors operating on commercial and industrial equipment.
Can a seized or burnt out motor be repaired on site?
Certain faults such as failed start capacitors, damaged terminal blocks, faulty contactors or loose connections can be rectified on site. If the internal copper windings have completely burnt out, a replacement motor is usually the most economical solution, or the unit can be taken to a dedicated rewind facility.
Why does my motor keep tripping the circuit breaker?
A motor that trips the supply immediately or after running briefly may suffer from degraded winding insulation, a failed start capacitor, an overloaded mechanical bearing, or a faulty thermal overload relay. We test the circuit systematically to isolate whether the fault is electrical or mechanical.
Will I receive an electrical certificate for the motor work?
When motor work involves running a brand new circuit from the distribution board or altering fixed wiring, we provide an electrical installation certificate through our NAPIT registration. Like-for-like motor swaps on existing circuits are tested thoroughly to confirm safe operating parameters.
Can you check the rotation direction of a new three phase motor?
Yes. Verifying shaft rotation is an essential step when commissioning three phase motors. If the motor turns in the wrong direction for the pump, fan or conveyor, we safely re-terminate the incoming phase conductors to achieve correct rotation before the machine runs under load.
