EV charger installation in Wareham

In Wareham, MX2 Electrical provides EV charger installation alongside electrical testing and fuse board replacement. Book Now to request the charger service for your property.

Calls answered 24/7

  • 2 years trading

EV charger installation pricing considerations

The baseline charge covers an installation where the parking spot sits close to a suitable electrical distribution board. The overall figure changes based on the physical distance, supply requirements, and the hardware selected.

From £300

Included when agreed

  • Survey of the parking space, the cable path and the consumer unit before we order or mount the unit
  • Mounting the chargepoint on the chosen wall, post or garage inside
  • A cable run from the fuse board or distribution board to the charger
  • Testing the circuit and leaving you able to charge
  • The completion records for the work we carried out

Ways to pay

  • Visa
  • Mastercard
  • American Express
  • Apple Pay
  • Google Pay
  • Klarna
  • Pay by bank
  • Bank transfer
  • The overall length and complexity of the cable run between your consumer unit and the charger location.
  • Whether your existing consumer unit has an available spare way or requires an additional board.
  • Whether the installation requires a single phase home unit or a commercial three phase connection.
  • Groundworks, ducting, or freestanding post requirements when mounting away from an exterior wall.
  • Current labour rate: £70 per hour.
  • Materials, specialist equipment and larger project work are confirmed separately before they go ahead.

View the EV charger installation cost guide for Wareham

EV charger installation across Wareham

We serve Wareham from our base in Poole.

Wareham town centreNorthportSandfordBH20

What happens on the day

Every installation follows a clear sequence, from checking the main intake to mounting the charging box and running electrical tests. We ensure the system is completely verified before handover.

  • Supply assessment and cable pathwaysWe begin by inspecting your main electrical intake, earth arrangements, and existing consumer unit. We confirm whether there is adequate spare capacity for the charging load, walk the cable pathway to the parking space, and confirm the exact mounting position on the wall.
  • Unit mounting and circuit connectionWe mechanically fix the EV charging unit to the chosen brickwork, render, or post. The dedicated cabling is secured along walls or through joist spaces, terminated into an individual protective breaker in the consumer unit, and wired through an external isolator where appropriate.
  • Electrical testing and charger commissioningWe run earth loop impedance tests, insulation resistance checks, and verify trip times on the circuit breaker. Once energised, we connect a test adapter to simulate a vehicle, confirm power delivery, and ensure the unit is ready to plug in.

How booking works

  1. Tell us about the job

    Tap Book Now and describe the work in the chat. Photos help.

  2. Get your price

    You see your price in the chat. A set price is paid at checkout; any other job is quoted first.

  3. Choose your visit

    Give your address and when you are free, and the visit is arranged.

Follow your job from booking to receipt

See when we're on our way, get your job report the moment we finish, and pay in seconds.

  • Track us on our way

    See us on the map with a live arrival time.

  • Your job report, same day

    See exactly what was done as soon as we finish.

  • Invoice and receipt in one place

    Pay online in seconds, and your receipt is always there when you need it.

Why choose MX2 Electrical

  • You see the price before you call

    Starting prices for the common jobs are published on this site, not held back until someone visits.

  • Registered work, certificated properly

    MX2 Electrical is NAPIT registered, and notifiable work is notified through that registration.

  • The fault gets found before the repair gets priced

    Testing establishes what is actually wrong rather than replacing parts in sequence.

Photo of Mohsen NazariMohsen NazariOwner
Reviews
101
Rating
4.9
Trading since
2024
“With over 20 years in the trade behind us, we are a fully qualified, NAPIT registered team covering Poole and the Dorset area, domestic and commercial. We turn up when we say we will, explain what needs doing before we do it, and leave the place as we found it.”

Mohsen Nazari, MX2 Electrical

Book Now

Photos of our work

Close-up of a wall-mounted Myenergi Zappi EV charger showing its display, controls and cable holder
Myenergi Zappi EV charger mounted on an exterior wall with its charging cable coiled around the unit

Frequently asked questions about EV charger installation

Still have a question?

Do I need a new consumer unit to install an EV charger?

Not necessarily. If your current fuse board has an available way and sufficient electrical capacity to handle the demand of an EV charger, we can wire directly into it. If your board is outdated or fully occupied, we can install a standalone small enclosure or discuss a consumer unit upgrade.

How long does an EV charger installation take?

A standard domestic installation where the charger is positioned near the consumer unit typically takes half a day. Longer cable runs, running cabling through lofts or under floorboards, or installing commercial units on remote mounting posts will take longer.

Can you install an EV charger if I have already bought the unit?

Yes. We frequently fit customer supplied charge points, provided the hardware meets UK electrical standards and is compatible with your electrical supply. We install the dedicated cabling, isolation switch, and protective devices required to complete the installation safely.

Will my electrical supply handle an EV charger?

We check your main incoming fuse and existing household electrical load during our initial assessment. Most modern domestic supplies comfortably handle a standard single phase charger. If your supply capacity is constrained, chargers with dynamic load management can prevent overloading.

What certification do I receive after the charger is installed?

Because an EV charging station requires a new dedicated circuit, it is notifiable under building regulations. As a NAPIT registered contractor, MX2 Electrical tests the circuit and provides an Electrical Installation Certificate, confirming full compliance for your home or business.

Book or ask a question

Calls answered 24/7