Consumer unit replacement in Westbourne

MX2 Electrical carries out fuse board replacement in Westbourne with Gold Card electricians who hold NVQ Level 3, and leaves the record once both the dead test and the live test are complete.

Calls answered 24/7

  • 2 years trading

Fuse board replacement pricing

We provide clear written quotes before commencing any work. The cost depends on the size of the installation and the condition of the existing wiring.

From £500

Included when agreed

  • Isolation of the meter tails and confirmation that the earth and bonding at the cupboard are present
  • Removal of the old fuse board or consumer unit and fitting of the new enclosure in the same cupboard where it will fit
  • Termination of existing circuits onto the new busbar, with miniature circuit breakers and residual current devices matched to those circuits
  • Circuit labels on the lid and a schedule that names lights, sockets, cooker, shower and any other ways in use
  • Dead testing and live testing of the new board, then the completion record for the work

Ways to pay

  • Visa
  • Mastercard
  • American Express
  • Apple Pay
  • Google Pay
  • Klarna
  • Pay by bank
  • Bank transfer
  • The price covers the replacement metal consumer unit, miniature circuit breakers, residual current devices, installation, and formal certification.
  • The overall cost varies depending on the number of usable ways required, three-phase supply arrangements, and the board configuration.
  • Upgrading undersized meter tails or renewing missing main bonding conductors to gas and water pipework will adjust the total quote.
  • Current labour rate: £70 per hour.
  • Materials, specialist equipment and larger project work are confirmed separately before they go ahead.

View the fuse board replacement cost guide for Westbourne

Consumer unit replacement across Westbourne

We serve Westbourne from our base in Poole.

Westbourne centreAlum ChineWest CliffBH4

What happens on the day

Replacing a consumer unit requires planning and care so disruption is kept to a minimum. We follow a clear installation sequence from main isolation through to live testing and system handover.

  • Supply isolation and pre-work checksBefore disconnecting the existing fuse box, we isolate the incoming electrical supply at the meter cutout and verify that the conductors are dead. We document the existing circuit distribution, record cable sizes, and check the condition of the main earth conductor and protective bonding.
  • Enclosure fitting and circuit terminationWe remove the legacy board and mount a modern fire-resistant metal consumer unit in the existing location. Each outgoing lighting, socket, and appliance circuit is trimmed, identified, and terminated onto its respective protective device, with neutral and earth conductors organised on dedicated bars.
  • Circuit testing and power restorationWith the installation completed, we conduct dead testing for continuity and insulation resistance, followed by live tests to confirm residual current devices trip within mandatory time limits. Once each circuit tests clear, power is restored and the board cover is clearly marked.

How booking works

  1. Tell us about the job

    Tap Book Now and describe the work in the chat. Photos help.

  2. Get your price

    You see your price in the chat. A set price is paid at checkout; any other job is quoted first.

  3. Choose your visit

    Give your address and when you are free, and the visit is arranged.

Follow your job from booking to receipt

See when we're on our way, get your job report the moment we finish, and pay in seconds.

  • Track us on our way

    See us on the map with a live arrival time.

  • Your job report, same day

    See exactly what was done as soon as we finish.

  • Invoice and receipt in one place

    Pay online in seconds, and your receipt is always there when you need it.

Why choose MX2 Electrical

  • You see the price before you call

    Starting prices for the common jobs are published on this site, not held back until someone visits.

  • Registered work, certificated properly

    MX2 Electrical is NAPIT registered, and notifiable work is notified through that registration.

  • The fault gets found before the repair gets priced

    Testing establishes what is actually wrong rather than replacing parts in sequence.

Photo of Mohsen NazariMohsen NazariOwner
Reviews
101
Rating
4.9
Trading since
2024
“With over 20 years in the trade behind us, we are a fully qualified, NAPIT registered team covering Poole and the Dorset area, domestic and commercial. We turn up when we say we will, explain what needs doing before we do it, and leave the place as we found it.”

Mohsen Nazari, MX2 Electrical

Book Now

Photos of our work

Electric shower replaced, with the supply and cable connections opened up
Waterfall chandelier hung over a kitchen island
Vent-Axia continuous running extract fan commissioned in a loft
EV charge point fitted beside a back door with its own isolator enclosure
Fox ESS EV charger installed with a weatherproof protective device box
Fuse box upgrade with the new board labelled circuit by circuit

Frequently asked questions about fuse board replacement

Still have a question?

How long will the electricity be turned off during the replacement?

For most domestic properties, the power remains off for several hours while the old fuse box is removed and the new metal unit is mounted and wired. We reconnect and test the system methodically so power is restored as soon as safety testing is complete.

Do I have to change my fuse box if it still works?

Older boards with rewirable fuse wire or wooden backs lack residual current devices that guard against electrical shocks. While an older unit may still conduct electricity, an upgrade is recommended when adding new circuits, after failing an EICR, or to improve safety.

Will the new consumer unit fit in my existing meter cupboard?

Modern metal consumer units have different dimensions compared to traditional fuse boxes. During our initial visit, we assess the space in your meter cupboard or utility area to select an enclosure that fits neatly while leaving room for cable entry and maintenance access.

Who informs building control about the consumer unit upgrade?

Replacing a consumer unit is notifiable under Part P of the Building Regulations. MX2 Electrical is NAPIT registered, meaning we submit the notification directly to building control and issue your compliance certificate once the testing is recorded.

What happens if an existing circuit has a wiring fault?

Because modern residual current devices are very sensitive, pre-existing wiring damage or neutral faults that went unnoticed on an old fuse wire may trip the new breaker. We test circuits prior to live energisation and advise you on any repairs needed to clear faults.

Book or ask a question

Calls answered 24/7