Solar panel installation in Broadstone
Solar panel installation for Broadstone landlords is completed by MX2 Electrical with the inverter tested on its own protection at the consumer unit.
Calls answered 24/7
- 2 years trading
Solar panel installation pricing
We quote solar installations clearly before work begins so you know the full cost in advance.
From £4,500
Included in the installation
- Running dedicated cabling between the solar array, inverter, and consumer unit
- Installing AC and DC isolator switches near the equipment
- Fitting circuit protection devices within or adjacent to the distribution board
- Verifying main earthing and bonding connections before energising
- Electrical testing and commissioning of the completed circuit
- Notifying the installation through our NAPIT registration
Ways to pay


- Pay by bank
- Bank transfer
- Labour and connection costs reflect the complexity of the cable run between the roof array, inverter and consumer unit.
- Required consumer unit upgrades, additional circuit protection or isolation equipment are quoted separately beforehand.
- Current labour rate: £70 per hour.
- Materials, specialist equipment and larger project work are confirmed separately before they go ahead.
Solar panel installation across Broadstone
We serve Broadstone from our base in Poole.
What happens on the day
We turn up on time, review cable runs through the property before starting, and isolate electrical circuits safely while completing the connections.
- Pre-installation assessment and isolationWe examine the existing consumer unit, confirm the positions for your inverter, generation meter and isolation switches, and safely isolate individual circuits to prepare for new cabling.
- Running cables and mounting hardwareInverters, safety switches and meters are secured firmly to internal or garage walls. Heavy-duty cabling runs through floor voids or protective conduit down to the distribution board to keep the finish neat.
- Electrical testing and system commissioningWe complete testing across the new circuit, check earth loop impedance and insulation resistance, energise the components and confirm that the inverter displays active solar generation.
How booking works
Tell us about the job
Tap Book Now and describe the work in the chat. Photos help.
Get your price
You see your price in the chat. A set price is paid at checkout; any other job is quoted first.
Choose your visit
Give your address and when you are free, and the visit is arranged.
Follow your job from booking to receipt
See when we're on our way, get your job report the moment we finish, and pay in seconds.
Track us on our way
See us on the map with a live arrival time.
Your job report, same day
See exactly what was done as soon as we finish.
Invoice and receipt in one place
Pay online in seconds, and your receipt is always there when you need it.
Why choose MX2 Electrical
You see the price before you call
Starting prices for the common jobs are published on this site, not held back until someone visits.
Registered work, certificated properly
MX2 Electrical is NAPIT registered, and notifiable work is notified through that registration.
The fault gets found before the repair gets priced
Testing establishes what is actually wrong rather than replacing parts in sequence.
- Reviews
- 101
- Rating
- 4.9
- Trading since
- 2024
“With over 20 years in the trade behind us, we are a fully qualified, NAPIT registered team covering Poole and the Dorset area, domestic and commercial. We turn up when we say we will, explain what needs doing before we do it, and leave the place as we found it.”
Mohsen Nazari, MX2 Electrical
Book NowPhotos of our work
Do solar panels generate electricity on overcast days in Broadstone?
Photovoltaic panels react to daylight rather than direct heat or intense sunshine. Output is higher on bright summer days, but your array still generates power during cloudier weather.
Will my consumer unit need changing before connecting solar panels?
The board requires an available way and compatible circuit protection that handles incoming generation. We check your existing fuse board beforehand; if extra protective components or a board upgrade are required, we explain that clearly.
Who notifies the electricity network about our solar connection?
Standard domestic solar generation connects under Engineering Recommendation G98. Following testing and commissioning, MX2 Electrical completes the required technical paperwork and submits it directly to the distribution network operator.
Can I add battery storage to the solar system later?
Yes. You can select a hybrid inverter from the start to take a battery in future, or connect an AC-coupled battery unit as a separate addition to the consumer unit at a later date.
Do domestic rooftop solar panels need planning permission?
Most residential solar panel installations are permitted development provided the panels do not extend significantly above the roof plane. Listed buildings or properties subject to specific local planning rules may require prior confirmation.
