Solar panel installation in Christchurch

Solar panel installation for Christchurch businesses is delivered by MX2 Electrical, from scaffolded roof panels to a generator notification sent to the network operator.

Calls answered 24/7

  • 2 years trading

Solar panel installation pricing

Pricing for solar PV electrical work is clear and confirmed in advance against the exact requirements of your property, with no hidden additions.

From £4,500

Included in the installation

  • Running dedicated cabling between the solar array, inverter, and consumer unit
  • Installing AC and DC isolator switches near the equipment
  • Fitting circuit protection devices within or adjacent to the distribution board
  • Verifying main earthing and bonding connections before energising
  • Electrical testing and commissioning of the completed circuit
  • Notifying the installation through our NAPIT registration

Ways to pay

  • Visa
  • Mastercard
  • American Express
  • Apple Pay
  • Google Pay
  • Klarna
  • Pay by bank
  • Bank transfer
  • The price covers dedicated cabling, AC and DC isolator switches, board protection devices, circuit testing, and NAPIT notification.
  • Total costs vary depending on the length and pathway of the cabling, the inverter location, and whether the consumer unit requires an upgraded enclosure.
  • Additional materials, specialist staging, or remedial repairs to existing household circuits are confirmed separately before work proceeds.
  • Current labour rate: £70 per hour.
  • Materials, specialist equipment and larger project work are confirmed separately before they go ahead.

Solar panel installation across Christchurch

We serve Christchurch from our base in Poole.

Christchurch town centreMudefordBurtonBH23

What happens on the day

Every solar connection visit follows a clear sequence, from initial power isolation to complete system commissioning and output checks.

  • Supply isolation and cable pathway reviewWe inspect the existing consumer unit or distribution board, confirm the exact positioning for the inverter and isolation switches, and safely disconnect the power before introducing new generation cabling into the property.
  • Inverter mounting and circuit wiringThe inverter, generation meter, and both AC and DC isolator switches are mounted securely in position. We run dedicated cabling through conduit or sub-floor spaces, linking the array to the protective switchgear with neat terminations.
  • Live testing and commissioningOnce the connections are mechanically secure, we conduct electrical safety testing on the new circuit, restore mains power, energise the solar system, and verify generation output readings directly through the inverter display.

How booking works

  1. Tell us about the job

    Tap Book Now and describe the work in the chat. Photos help.

  2. Get your price

    You see your price in the chat. A set price is paid at checkout; any other job is quoted first.

  3. Choose your visit

    Give your address and when you are free, and the visit is arranged.

Follow your job from booking to receipt

See when we're on our way, get your job report the moment we finish, and pay in seconds.

  • Track us on our way

    See us on the map with a live arrival time.

  • Your job report, same day

    See exactly what was done as soon as we finish.

  • Invoice and receipt in one place

    Pay online in seconds, and your receipt is always there when you need it.

Why choose MX2 Electrical

  • You see the price before you call

    Starting prices for the common jobs are published on this site, not held back until someone visits.

  • Registered work, certificated properly

    MX2 Electrical is NAPIT registered, and notifiable work is notified through that registration.

  • The fault gets found before the repair gets priced

    Testing establishes what is actually wrong rather than replacing parts in sequence.

Photo of Mohsen NazariMohsen NazariOwner
Reviews
101
Rating
4.9
Trading since
2024
“With over 20 years in the trade behind us, we are a fully qualified, NAPIT registered team covering Poole and the Dorset area, domestic and commercial. We turn up when we say we will, explain what needs doing before we do it, and leave the place as we found it.”

Mohsen Nazari, MX2 Electrical

Book Now

Photos of our work

Old wired fuse board replaced with a new metal consumer unit
Earth loop impedance readings taken during a landlord EICR
Electric shower replaced, with the supply and cable connections opened up
Waterfall chandelier hung over a kitchen island
Vent-Axia continuous running extract fan commissioned in a loft
EV charge point fitted beside a back door with its own isolator enclosure

Frequently asked questions about solar installation

Still have a question?

Do solar panels generate power on cloudy days?

Photovoltaic panels operate on daylight rather than direct heat or intense sunlight. Even during overcast weather in Dorset, the panels generate electricity that feeds into your consumer unit, helping reduce the amount of electricity drawn from the national grid.

Will our existing consumer unit work with solar panels?

Your consumer unit needs an available spare way and protection devices that support bidirectional power flow. During our initial checks, we assess your distribution board to confirm compatibility. If new protective components or an upgraded board are required, we explain this before proceeding.

Is planning permission required for rooftop solar panels?

Most domestic solar installations are covered by permitted development rights, provided panels do not extend beyond standard limits above the roofline. Properties located in conservation areas or listed buildings within Christchurch may have local planning restrictions that require council consultation.

How is the local electricity network notified about the system?

Domestic systems up to 3.68kW per phase connect under Engineering Recommendation G98 guidelines. After testing and commissioning your installation, we complete the required documentation and submit the notification directly to the distribution network operator.

Can battery storage be integrated with the system in the future?

Yes. You can choose a hybrid inverter during the initial installation to accommodate future storage, or an AC-coupled battery system can be added as a standalone circuit beside the existing solar setup at any later point.

Book or ask a question

Calls answered 24/7