Solar panel installation in Parkstone

Solar panel installation in Parkstone lets a tenant or owner see MX2 Electrical connect the inverter with separate protection, then complete the tests.

Calls answered 24/7

  • 2 years trading

Solar electrical installation pricing

We provide clear quotes for connecting solar equipment based on the layout of your property and the requirements of your existing board.

From £4,500

Included in the installation

  • Running dedicated cabling between the solar array, inverter, and consumer unit
  • Installing AC and DC isolator switches near the equipment
  • Fitting circuit protection devices within or adjacent to the distribution board
  • Verifying main earthing and bonding connections before energising
  • Electrical testing and commissioning of the completed circuit
  • Notifying the installation through our NAPIT registration

Ways to pay

  • Visa
  • Mastercard
  • American Express
  • Apple Pay
  • Google Pay
  • Klarna
  • Pay by bank
  • Bank transfer
  • The price covers running cabling, fitting AC and DC isolators, installing board protection devices, electrical testing, and network notifications.
  • Cost varies depending on the distance between the array, inverter, and consumer unit, as well as whether your existing board has spare ways available.
  • Any remedial work needed on existing household wiring or main earthing conductors is quoted separately before work begins.
  • Current labour rate: £70 per hour.
  • Materials, specialist equipment and larger project work are confirmed separately before they go ahead.

Solar panel installation across Parkstone

We serve Parkstone from our base in Poole.

Ashley CrossLower ParkstoneUpper ParkstoneBH12BH14

What happens on the day

Our visit focuses on safely integrating generation equipment, carrying out careful electrical wiring, and leaving your property tidy.

  • Arrival and cable routing discussionWe arrive on schedule, examine the consumer unit, and review the planned route for the cables between the roof entry point, inverter, and electrical board. We protect your floor surfaces before getting tools out.
  • Mounting equipment and safe isolationWe isolate electrical circuits safely while wiring into the main board. Inverters, rotary isolators, and generation meters are mounted securely to solid walls or purpose-built mounting boards with tidy conduit runs.
  • System testing and live energisationBefore switching the generation equipment on, we run dead and live electrical tests to confirm insulation resistance, polarity, and earth loop values. We then energise the inverter and verify generation into the consumer unit.

How booking works

  1. Tell us about the job

    Tap Book Now and describe the work in the chat. Photos help.

  2. Get your price

    You see your price in the chat. A set price is paid at checkout; any other job is quoted first.

  3. Choose your visit

    Give your address and when you are free, and the visit is arranged.

Follow your job from booking to receipt

See when we're on our way, get your job report the moment we finish, and pay in seconds.

  • Track us on our way

    See us on the map with a live arrival time.

  • Your job report, same day

    See exactly what was done as soon as we finish.

  • Invoice and receipt in one place

    Pay online in seconds, and your receipt is always there when you need it.

Why choose MX2 Electrical

  • You see the price before you call

    Starting prices for the common jobs are published on this site, not held back until someone visits.

  • Registered work, certificated properly

    MX2 Electrical is NAPIT registered, and notifiable work is notified through that registration.

  • The fault gets found before the repair gets priced

    Testing establishes what is actually wrong rather than replacing parts in sequence.

Photo of Mohsen NazariMohsen NazariOwner
Reviews
101
Rating
4.9
Trading since
2024
“With over 20 years in the trade behind us, we are a fully qualified, NAPIT registered team covering Poole and the Dorset area, domestic and commercial. We turn up when we say we will, explain what needs doing before we do it, and leave the place as we found it.”

Mohsen Nazari, MX2 Electrical

Book Now

Photos of our work

Row of outdoor bollard lights illuminating a driveway beside a slatted boundary fence
Outdoor bollard lights illuminating a driveway beside a hedge and entrance gate
Old wired fuse board replaced with a new metal consumer unit
Earth loop impedance readings taken during a landlord EICR
Electric shower replaced, with the supply and cable connections opened up
Waterfall chandelier hung over a kitchen island

Common questions about Parkstone solar panel installations

Still have a question?

Do solar panels generate power on overcast days?

Photovoltaic panels generate electricity from daylight rather than hot sunlight alone. Even on cloudy days in Dorset, the panels continue to generate electricity, although peak generation occurs when daylight intensity is strongest.

Will my consumer unit need changing to connect solar panels?

Your consumer unit requires an open spare way and protective devices suitable for bidirectional generation. During our initial visit, we inspect the board. If new components or a consumer unit upgrade are required, we explain this clearly before proceeding.

Who notifies the electricity network operator about the solar array?

Standard domestic installations up to 3.68kW per phase operate under Engineering Recommendation G98. MX2 Electrical completes the testing and files the formal connection documentation directly with the distribution network operator on your behalf.

Can battery storage be added to the solar installation later?

Yes. You can install an AC-coupled battery system at any time in the future, or we can install a hybrid inverter during the initial solar installation that is already prepared to accept direct battery connections whenever you decide to expand.

Do solar installations require planning permission?

Most residential solar panel installations are classed as permitted development, provided the panels do not sit excessively high above the roof surface. However, properties in conservation areas or listed buildings may face local council restrictions that must be checked beforehand.

Book or ask a question

Calls answered 24/7