Solar panel installation in Bournemouth from MX2 Electrical finishes with the network operator notified about your generator. Testing is completed and the certificate is left with you.
Calls answered 24/7
- 2 years trading
Solar electrical installation costs
Our pricing covers all labour, cabling, isolators, protective devices, full testing, and formal electrical certification for connecting your solar photovoltaic system.
From £4,500
Included in the installation
- Running dedicated cabling between the solar array, inverter, and consumer unit
- Installing AC and DC isolator switches near the equipment
- Fitting circuit protection devices within or adjacent to the distribution board
- Verifying main earthing and bonding connections before energising
- Electrical testing and commissioning of the completed circuit
- Notifying the installation through our NAPIT registration
Ways to pay


- Pay by bank
- Bank transfer
- The price covers wiring, AC and DC isolators, distribution board breakers, testing, and official notifications.
- The distance between the panels, inverter, and consumer unit changes the cable length and containment required.
- If your consumer unit lacks spare ways or requires bidirectional protective upgrades, we quote those items separately.
- Current labour rate: £70 per hour.
- Materials, specialist equipment and larger project work are confirmed separately before they go ahead.
Solar panel installation across Bournemouth
We serve Bournemouth from our base in Poole.
What happens on the day
We turn up at the scheduled time, protect floors and work surfaces, and explain every cable run and component location before beginning work on your electrical system.
- System survey and electrical isolationWe inspect your main service head, earthing type, and consumer unit spare capacity. Electrical power to relevant consumer unit circuits is isolated safely before opening enclosures.
- Mounting gear and cable routingThe inverter, isolator switches, and any metering equipment are fixed firmly to structural walls. We run fire-rated cabling between the solar array isolator and the distribution board.
- Testing and system commissioningWe carry out dead testing for continuity and insulation resistance, followed by live voltage and polarity checks. Once energised, we verify generation export and inverter operation.
How booking works
Tell us about the job
Tap Book Now and describe the work in the chat. Photos help.
Get your price
You see your price in the chat. A set price is paid at checkout; any other job is quoted first.
Choose your visit
Give your address and when you are free, and the visit is arranged.
Follow your job from booking to receipt
See when we're on our way, get your job report the moment we finish, and pay in seconds.
Track us on our way
See us on the map with a live arrival time.
Your job report, same day
See exactly what was done as soon as we finish.
Invoice and receipt in one place
Pay online in seconds, and your receipt is always there when you need it.
Why choose MX2 Electrical
You see the price before you call
Starting prices for the common jobs are published on this site, not held back until someone visits.
Registered work, certificated properly
MX2 Electrical is NAPIT registered, and notifiable work is notified through that registration.
The fault gets found before the repair gets priced
Testing establishes what is actually wrong rather than replacing parts in sequence.
- Reviews
- 101
- Rating
- 4.9
- Trading since
- 2024
“With over 20 years in the trade behind us, we are a fully qualified, NAPIT registered team covering Poole and the Dorset area, domestic and commercial. We turn up when we say we will, explain what needs doing before we do it, and leave the place as we found it.”
Mohsen Nazari, MX2 Electrical
Book NowPhotos of our work
Will my consumer unit need changing to connect solar panels?
Not always. Your consumer unit needs an available spare way and must be capable of housing a bidirectional circuit breaker. If the current board lacks spare ways, is fully loaded, or uses older wire fuses, we can install a small dedicated generation consumer unit alongside it or quote for a modern consumer unit replacement.
Can battery storage be added to my solar setup in the future?
Yes. If you install a hybrid inverter now, battery storage can usually be wired directly to it at a later date. Alternatively, an AC-coupled battery system with its own inverter can be connected to your consumer unit on a separate circuit down the line.
Who informs the electricity network operator about the solar installation?
We manage the formal paperwork for the distribution network operator. Standard domestic installations generating up to 3.68kW per single phase fall under Engineering Recommendation G98, which allows us to notify the network operator directly following testing and commissioning.
Do solar panels generate electricity on overcast days in Bournemouth?
Yes. Solar photovoltaic panels react to daylight rather than heat or direct sunlight alone. Generation drops during heavily overcast weather compared to bright sunny days, but your system will still supply electricity to offset household consumption.
What electrical paperwork do I get after the solar connection is completed?
We issue an Electrical Installation Certificate that details the design, construction, inspection, and test results of the new generation circuit. We also register the installation through NAPIT, which arranges your building regulations compliance certificate.