EICR in Canford Heath

EICR appointments for Canford Heath give homeowners the written test record from MX2 Electrical after the fixed installation is tested.

Calls answered 24/7

  • 2 years trading

EICR pricing structure

Testing prices reflect the specific setup of the building and the overall number of electrical circuits being tested. Transparent pricing details are confirmed before testing begins.

From £110

Included in the inspection

  • Visual check of the consumer unit, cabling, sockets, lights, showers and other fixed accessories
  • Dead and live tests on the circuits that can be reached on the day
  • Earth bonding and earthing checks where the metalwork is accessible
  • A written EICR with C1, C2, C3 and FI observations
  • A short talk through the findings before we leave

Ways to pay

  • Visa
  • Mastercard
  • American Express
  • Apple Pay
  • Google Pay
  • Klarna
  • Pay by bank
  • Bank transfer
  • The starting price covers a standard visual check and instrument testing of the base number of circuits.
  • The final price adjusts based on the total circuit count and whether the system is single-phase domestic or three-phase commercial.
  • Any remedial repairs highlighted during the inspection are quoted separately from the inspection itself.
  • Current labour rate: £70 per hour.
  • Materials, specialist equipment and larger project work are confirmed separately before they go ahead.

View the EICR cost guide for Canford Heath

EICR across Canford Heath

We serve Canford Heath from our base in Poole.

Canford Heath EastCanford Heath WestAdastral RoadBH17

What happens on the day

Power is isolated in stages during the testing procedure to allow thorough checks. We confirm an orderly testing sequence on arrival so disruptions to refrigeration, computer equipment or tenants remain minimal.

  • Initial visual inspectionWe examine the consumer unit, accessible wiring runs, light switches, sockets and fixed appliances for physical damage, thermal damage or incorrect installation methods. Earthing and bonding clamps on incoming service pipework are checked for secure connection.
  • Dead testing of isolated circuitsWith the mains electricity supply isolated, instrument tests verify continuity of protective conductors, ring final circuit continuity and insulation resistance across cables. These tests confirm the physical integrity of hidden wiring within walls and floors.
  • Live testing and device operationPower is restored to conduct live tests including earth fault loop impedance measurements and verification that residual current devices trip within mandatory disconnection times. Polarity is confirmed across all accessible distribution points.
  • Findings review and classificationObserved issues receive standard safety codes. Items posing immediate danger receive code C1, potentially dangerous defects receive code C2, improvement items receive code C3, and components requiring deeper investigation receive code FI.

How booking works

  1. Tell us about the job

    Tap Book Now and describe the work in the chat. Photos help.

  2. Get your price

    You see your price in the chat. A set price is paid at checkout; any other job is quoted first.

  3. Choose your visit

    Give your address and when you are free, and the visit is arranged.

Follow your job from booking to receipt

See when we're on our way, get your job report the moment we finish, and pay in seconds.

  • Track us on our way

    See us on the map with a live arrival time.

  • Your job report, same day

    See exactly what was done as soon as we finish.

  • Invoice and receipt in one place

    Pay online in seconds, and your receipt is always there when you need it.

Why choose MX2 Electrical

  • You see the price before you call

    Starting prices for the common jobs are published on this site, not held back until someone visits.

  • Registered work, certificated properly

    MX2 Electrical is NAPIT registered, and notifiable work is notified through that registration.

  • The fault gets found before the repair gets priced

    Testing establishes what is actually wrong rather than replacing parts in sequence.

Photo of Mohsen NazariMohsen NazariOwner
Reviews
101
Rating
4.9
Trading since
2024
“With over 20 years in the trade behind us, we are a fully qualified, NAPIT registered team covering Poole and the Dorset area, domestic and commercial. We turn up when we say we will, explain what needs doing before we do it, and leave the place as we found it.”

Mohsen Nazari, MX2 Electrical

Book Now

Photos of our work

Earth loop impedance readings taken during a landlord EICR
Electric shower replaced, with the supply and cable connections opened up
Waterfall chandelier hung over a kitchen island
Vent-Axia continuous running extract fan commissioned in a loft
EV charge point fitted beside a back door with its own isolator enclosure
Fox ESS EV charger installed with a weatherproof protective device box

Frequently asked questions about EICRs

Still have a question?

What is an EICR?

An Electrical Installation Condition Report is a formal assessment of the fixed wiring in a building. It checks consumer units, cabling, accessories, earthing and bonding against national safety standards to confirm the installation is safe for continued use.

Are private landlords required to obtain an EICR?

Yes. Landlords letting residential properties in England must have the electrical installation inspected and tested at least every five years, or at the start of a new tenancy. A copy of the satisfactory report must be supplied to tenants.

What do the observation codes C1, C2, C3 and FI indicate?

Code C1 indicates immediate danger that requires urgent attention. Code C2 signifies a potential danger that needs prompt remedial action. Code C3 denotes a recommendation for improvement that is not immediately dangerous. Code FI marks an item that requires further investigation.

Will the mains electricity be switched off during the inspection?

Yes. The power must be turned off to perform dead testing and inspect internal components safely. Circuits are isolated progressively to keep disruption low, and full electrical supply is restored before we leave the building.

Can MX2 Electrical carry out the remedial repairs if the report is unsatisfactory?

Yes. If an inspection identifies C1, C2 or FI items, we prepare a separate itemised quotation for the required remedial work. You can review the proposed repairs and arrange the corrective work at your convenience.

Book or ask a question

Calls answered 24/7