Multifunction tester in use during an EICR inspection by MX2 Electrical

4.9 · 86 reviews

EICR in Poole

An electrical installation condition report confirms whether your fixed wiring, consumer unit and circuits are safe to use. MX2 Electrical carries out detailed testing and inspections for homeowners and landlords in Poole, Bournemouth and Broadstone. Our NAPIT registered electricians assess your electrical installations and issue a full report detailing any damage or wear.

  • Local & Trusted
  • Fast & Reliable
  • Upfront Pricing
  • Free Quotes

EICR prices

Published rates for electrical safety testing across domestic and rental properties.

  • Covers the standard visual inspection, circuit testing and production of the formal digital report.
  • Excludes any separate remedial repairs or replacement parts required to clear identified fault codes.
  • Current labour rate: £70 per hour.
  • Materials, specialist equipment and larger project work are confirmed separately before they go ahead.

See how our eicr price compares, town by town

Trusted by customers

Customer feedback on electrical safety testing, installations and repair projects completed across Dorset.

4.9

MX2 Electrical is frequently praised for prompt, professional and friendly service, with electricians who explain the work clearly, offer options and complete jobs efficiently. Reviews commonly mention EICRs, EV charger installations, sockets, lighting, wiring, ventilation, consumer units and cooker work, with neat finishes, tidy work areas and fair pricing standing out. A small number of reviews raise concerns about follow-up costs and remedial work after EICRs.

Summarised with AI

I’m Really happy with the work from both of them. They installed a new socket in our conservatory and did a great job. They were both professional, friendly, tidy and made sure everything was done properly. I’m very pleased with the result and would definitely recommend them. Thank you both for your hard work!

Jonas “Almost Jonas” E.
Google

MX2 came along promptly to quote, their quote was reasonable and they gave us options. The work itself was done quickly, efficiently and very neatly, they went the extra mile adding extra without quibbling, and they left the flat in a very tidy space.

C.W 2.
Google

Great job

Asa, S.
MyBuilder

Know when an EICR is useful

Periodic electrical testing confirms whether an existing installation remains safe for ongoing use.

Rental property compliance

Landlords letting flats in Bournemouth or houses in Broadstone must provide a satisfactory condition report to tenants and local authorities.

Buying or selling a home

Buyers evaluating Victorian villas in Westbourne or older houses in Wimborne Minster often request testing to identify aging wiring before completing a purchase.

Periodic safety checks

Homeowners in Poole and Parkstone book testing to check aging consumer units, identify hidden deterioration and confirm circuit earthing.

What the inspection covers

Testing covers the permanent electrical infrastructure inside the building.

Included in the inspection

  • Visual inspection of consumer units, switches, sockets and visible cable runs
  • Instrument testing of circuit continuity, insulation resistance and polarity
  • Verification of earthing, bonding conductors and protective devices
  • Production of the completed digital report with classification codes

Not included automatically

  • Remedial repair work or rewiring to rectify noted faults
  • Testing of portable appliances and plugged-in equipment
  • Investigation of concealed cabling requiring destructive building work

What happens on the day

The inspection requires brief disconnections to individual circuits while testing takes place.

  1. 01

    Power interruption

    Power is turned off to individual circuits or the whole property during instrument testing. Sensitive electronics should be safely shut down beforehand.

  2. 02

    Access requirements

    Clear access is needed to the main consumer unit, electric meter, earthing connections and all accessible sockets, switches and light fittings.

  3. 03

    Initial debrief

    Any immediate safety observations are discussed on site before the final formal paperwork is compiled.

Understand the report

The completed report highlights any observed defects using standardised classification codes.

C1
Danger present. Risk of injury exists and immediate remedial action is required to make the installation safe.
C2
Potentially dangerous. Urgent remedial action is required to remove the hazard, resulting in an overall unsatisfactory report.
C3
Improvement recommended. The installation does not meet modern wiring standards but is not currently dangerous.
FI
Further investigation required. An issue could not be fully verified during the inspection and requires additional assessment without delay.

Why choose us

Use one local team for electrical inspection, diagnosis, installation and certification across homes, workplaces and light-industrial settings.

Public liability £2,000,000 · Nvq level 3, Gold Card Electrician · NAPIT

Get Free Quote

You see the price before you call

  • Starting prices for the common jobs are published on this site, not held back until someone visits.
  • Each one says what moves it: the circuit count on an EICR, the cable run on a charge point, the board type on a consumer unit.
  • The full price is confirmed against your actual job before any work starts.
Get Free Quote
Ceiling downlight being fitted into a plasterboard ceiling by MX2 Electrical

Registered work, certificated properly

  • MX2 Electrical is NAPIT registered, and notifiable work is notified through that registration.
  • Consumer unit replacements, new circuits and inspections leave you holding the certificate.
  • The business carries two million pounds of public liability cover.
Get Free Quote
New cable routed through exposed floor joists during a rewire by MX2 Electrical

The fault gets found before the repair gets priced

  • Testing establishes what is actually wrong rather than replacing parts in sequence.
  • You are told what was found and what putting it right involves before it is agreed.
  • Where an inspection turns up remedial work, it is quoted separately so it stays your decision.
Get Free Quote
Cover being fitted to a new consumer unit by MX2 Electrical

What the law requires of landlords

  • In England, the electrical installation in a rented property must be inspected and tested at least every five years by a qualified person, and to the standard of BS 7671 — the 18th Edition wiring regulations.
  • The landlord must give a copy of the report to each existing tenant within 28 days of the inspection, and to any new tenant before they occupy the property.
  • The landlord must supply a copy to the local housing authority within seven days of the authority requesting it.
  • Where the report requires remedial or further investigative work, it must be carried out within 28 days, or sooner if the report says so, and written confirmation obtained.

Source: The Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020

EICR questions

Answers to common questions regarding electrical installation testing.

How often do I need an EICR for my rental property?+

I carry out these checks every five years for landlords, or at every change of tenancy if specified in your letting agreements. English regulations require private rentals to hold a satisfactory report.

Will my power be turned off during the inspection?+

Yes, I will need to isolate the electricity supply at the consumer unit to test individual circuit conductors and protective devices safely.

What happens if the report comes back unsatisfactory?+

An unsatisfactory report contains C1, C2 or FI codes. You must have remedial work completed by a qualified electrician to rectify the faults within 28 days or any shorter timeframe noted.

Do you supply a certificate after testing?+

A digital Electrical Installation Condition Report is provided detailing all test results, board schedules, observations and the overall outcome of the inspection.

Trusted EICR guidance

Official statutory guidance and classification standards for electrical inspections.

Start with the job details

Share the electrical problem, property or site type and postcode. MX2 will confirm availability, scope and pricing before work goes ahead.