EICR in Bournemouth

EICR testing from MX2 Electrical gives Bournemouth landlords the written report in their hands before we leave the property.

Calls answered 24/7

  • 2 years trading

Electrical testing costs and pricing structure

The price of an inspection reflects the time needed to thoroughly test and document every circuit on the board. Rates depend on the size of the installation rather than an arbitrary estimate.

From £110

Included in the inspection

  • Visual check of the consumer unit, cabling, sockets, lights, showers and other fixed accessories
  • Dead and live tests on the circuits that can be reached on the day
  • Earth bonding and earthing checks where the metalwork is accessible
  • A written EICR with C1, C2, C3 and FI observations
  • A short talk through the findings before we leave

Ways to pay

  • Visa
  • Mastercard
  • American Express
  • Apple Pay
  • Google Pay
  • Klarna
  • Pay by bank
  • Bank transfer
  • The total number of electrical circuits on the consumer unit dictates the testing fee.
  • Commercial three-phase distribution boards require more testing time than domestic single-phase units.
  • Any remedial work required to resolve unsatisfactory codes is quoted separately.
  • Current labour rate: £70 per hour.
  • Materials, specialist equipment and larger project work are confirmed separately before they go ahead.

View the EICR cost guide for Bournemouth

EICR across Bournemouth

We serve Bournemouth from our base in Poole.

Bournemouth town centreBoscombeSouthbourneWintonWest CliffBH1BH2BH3BH4BH5BH6BH7BH8BH9BH10BH11

What happens on the day

An inspection involves checking both accessible electrical accessories and internal consumer unit connections. We isolate circuits in stages to carry out testing while keeping unnecessary disruption to a minimum.

  • Arrival and running order agreementWhen we arrive at your Bournemouth property, we locate the consumer unit, identify the areas served and talk through which sections need isolation first. This helps manage power interruptions for appliances, home working or building occupants.
  • Physical inspection and electrical instrument testsWe open the consumer unit to check termination tightness, conductor sizing and protective devices. Using calibrated instruments, we complete dead tests for continuity and insulation resistance, followed by live testing for polarity and earth fault loops.
  • Earthing and bonding verificationMetal water and gas service pipes require main protective bonding to prevent touch voltages during faults. We locate the bonding clamps, check earthing conductors at the intake position, and verify proper earthing connections.
  • On-site review of observationsBefore leaving, we explain our findings in clear language. Any observation codes are highlighted so you understand whether the installation is satisfactory or requires remedial attention to clear safety hazards.

How booking works

  1. Tell us about the job

    Tap Book Now and describe the work in the chat. Photos help.

  2. Get your price

    You see your price in the chat. A set price is paid at checkout; any other job is quoted first.

  3. Choose your visit

    Give your address and when you are free, and the visit is arranged.

Follow your job from booking to receipt

See when we're on our way, get your job report the moment we finish, and pay in seconds.

  • Track us on our way

    See us on the map with a live arrival time.

  • Your job report, same day

    See exactly what was done as soon as we finish.

  • Invoice and receipt in one place

    Pay online in seconds, and your receipt is always there when you need it.

Why choose MX2 Electrical

  • You see the price before you call

    Starting prices for the common jobs are published on this site, not held back until someone visits.

  • Registered work, certificated properly

    MX2 Electrical is NAPIT registered, and notifiable work is notified through that registration.

  • The fault gets found before the repair gets priced

    Testing establishes what is actually wrong rather than replacing parts in sequence.

Photo of Mohsen NazariMohsen NazariOwner
Reviews
101
Rating
4.9
Trading since
2024
“With over 20 years in the trade behind us, we are a fully qualified, NAPIT registered team covering Poole and the Dorset area, domestic and commercial. We turn up when we say we will, explain what needs doing before we do it, and leave the place as we found it.”

Mohsen Nazari, MX2 Electrical

Book Now

Photos of our work

Myenergi Zappi EV charger mounted on an exterior wall with its charging cable coiled around the unit
Close-up of a wall-mounted Myenergi Zappi EV charger showing its display, controls and cable holder
Two vertical outdoor wall lights illuminating a front entrance at dusk
Outdoor bollard lights and garden spotlights illuminating a curved driveway and planted border
Row of outdoor bollard lights illuminating a driveway beside a slatted boundary fence
Outdoor bollard lights illuminating a driveway beside a hedge and entrance gate

Frequently asked questions about Bournemouth EICR inspections

Still have a question?

How often is an EICR required in Bournemouth?

For private rented domestic homes, regulations require an inspection at least every five years or at every change of tenancy. Commercial premises typically require testing every five years, while owner-occupied domestic homes are recommended to have an inspection every ten years or when buying or selling.

What do the safety codes on the report mean?

Codes indicate the level of risk. Code C1 means danger is present with risk of injury, requiring immediate action. Code C2 indicates a potential danger requiring urgent remedial work. Code C3 points out a recommended improvement that is not immediately unsafe. Code FI indicates that further investigation is needed into a specific circuit.

Will the electricity need to be switched off during the inspection?

Yes, the electrical power must be turned off for parts of the test. We isolate individual circuits to carry out insulation resistance and dead testing safely. We coordinate the sequence of testing to limit disruption, and power is restored before we finish the visit.

What happens if my Bournemouth property fails the EICR?

If an installation receives an unsatisfactory outcome due to C1 or C2 observations, remedial repairs must be carried out to achieve compliance. We explain what needs rectification and provide a separate quote for the remedial repairs so the necessary work can be completed.

Does the inspection cover portable appliances?

No, an electrical installation condition report only checks the fixed wiring, distribution equipment, light fittings and fixed socket outlets. Portable electrical items such as kettles, heaters and computers require separate portable appliance testing.

Book or ask a question

Calls answered 24/7