Battery storage installation in Parkstone
MX2 Electrical offers home and commercial battery storage installation in Parkstone, alongside consumer unit replacement and electrical testing. Book Now for the battery installation you need.
Calls answered 24/7
- 2 years trading
Battery storage installation costs in Parkstone
Prices for battery installations are established clearly before any work begins, with every quotation itemising the necessary equipment, materials and testing required for the project.
From £2,500
Battery storage installation: from £2,500
Commercial battery storage installation: from £18,000
Included in the installation
- Assessment of your existing consumer unit, main earthing and electrical bonding
- Installation of dedicated circuits, rotary isolators and protective devices
- Mounting and wiring of the battery unit and compatible inverter
- Running and securing cables between the battery, inverter and distribution board
- Commissioning of battery operating settings and monitoring connections
- Verification testing of earth loop impedance and protective devices
- Submission of G98 or G99 paperwork to the distribution network operator
Ways to pay


- Pay by bank
- Bank transfer
- The quotation covers mounting the battery and inverter, cabling runs, circuit protective equipment, electrical testing and network operator paperwork.
- The total price changes depending on battery storage capacity, whether single or three phase connections are required, and the distance between the battery and consumer unit.
- Any required consumer unit upgrades, earthing enhancements or specialist fire rated enclosures are detailed clearly before installation starts.
- Current labour rate: £70 per hour.
- Materials, specialist equipment and larger project work are confirmed separately before they go ahead.
Battery storage installation across Parkstone
We serve Parkstone from our base in Poole.
What happens on the day
Visits are organised to install equipment safely, minimise disruptions to your household electricity and leave the operating space clean and fully functioning.
- Surface protection and positioning checkFlooring and nearby fittings around the intended installation spot are protected. The structural suitability of the wall or floor mount is checked alongside the planned cable pathway back to the main distribution board.
- Mounting and running dedicated cablingThe battery chassis and matching inverter are fixed into position. Heavy duty cabling, rotary isolators and individual circuit protective devices are installed in compliance with BS 7671 wiring standards.
- Final distribution board integration and testingMains power is briefly turned off while the new dedicated supply circuit is tied into the consumer unit. Earth loop impedance, insulation resistance and polarity are checked using calibrated test meters before restoring power.
- System configuration and handoverOperating parameters and monitoring connections are set up. We walk you through the isolation switches, show you how to review daily usage statistics and ensure the area is left tidy.
How booking works
Tell us about the job
Tap Book Now and describe the work in the chat. Photos help.
Get your price
You see your price in the chat. A set price is paid at checkout; any other job is quoted first.
Choose your visit
Give your address and when you are free, and the visit is arranged.
Follow your job from booking to receipt
See when we're on our way, get your job report the moment we finish, and pay in seconds.
Track us on our way
See us on the map with a live arrival time.
Your job report, same day
See exactly what was done as soon as we finish.
Invoice and receipt in one place
Pay online in seconds, and your receipt is always there when you need it.
Why choose MX2 Electrical
You see the price before you call
Starting prices for the common jobs are published on this site, not held back until someone visits.
Registered work, certificated properly
MX2 Electrical is NAPIT registered, and notifiable work is notified through that registration.
The fault gets found before the repair gets priced
Testing establishes what is actually wrong rather than replacing parts in sequence.
- Reviews
- 101
- Rating
- 4.9
- Trading since
- 2024
“With over 20 years in the trade behind us, we are a fully qualified, NAPIT registered team covering Poole and the Dorset area, domestic and commercial. We turn up when we say we will, explain what needs doing before we do it, and leave the place as we found it.”
Mohsen Nazari, MX2 Electrical
Book NowPhotos of our work
Can I install battery storage if my property does not have solar panels?
Yes. A standalone battery connects to the mains supply and charges from the national grid during off peak times on flexible electricity tariffs. The stored power is then drawn down during regular daytime hours when grid prices are higher.
Where can a battery unit be installed in a Parkstone home?
Batteries and inverters can be installed in garages, utility rooms or on external brick walls, provided the location meets manufacturer guidelines for temperature control, ventilation and structural support. Lofts may also be suitable if load bearing requirements are satisfied.
How is battery storage connected to the electrical supply?
The battery and inverter connect to the electrical installation through dedicated cabling, isolators and circuit protection. The electrician tests the new circuit before turning on the system and setting up its operating controls.
Will a battery system keep running during a power cut?
Standard installations automatically shut down when mains electricity fails to protect utility personnel working on the grid. Properties requiring backup power during outages need an optional emergency power supply switch and separate grounding controls installed alongside the battery.
How long does a battery storage installation take to complete?
Most domestic systems take one to two days to fit, wire and test. Mains power to your building is only switched off for a short portion of the visit while final connections are made inside your consumer unit.
