Battery storage installation in Canford Heath

If you let a property in Canford Heath, MX2 Electrical will handle battery storage installation and send the network operator notification when commissioning ends.

Calls answered 24/7

  • 2 years trading

Battery installation pricing considerations

Pricing is based on the specific electrical requirements of your property, with all details explained before work begins.

From £2,500

Battery storage installation: from £2,500

Commercial battery storage installation: from £18,000

Included in the installation

  • Assessment of your existing consumer unit, main earthing and electrical bonding
  • Installation of dedicated circuits, rotary isolators and protective devices
  • Mounting and wiring of the battery unit and compatible inverter
  • Running and securing cables between the battery, inverter and distribution board
  • Commissioning of battery operating settings and monitoring connections
  • Verification testing of earth loop impedance and protective devices
  • Submission of G98 or G99 paperwork to the distribution network operator

Ways to pay

  • Visa
  • Mastercard
  • American Express
  • Apple Pay
  • Google Pay
  • Klarna
  • Pay by bank
  • Bank transfer
  • The price covers the dedicated circuit installation, battery mounting, electrical testing and network notifications.
  • Total cost varies depending on battery capacity, inverter model and the distance from your consumer unit to the battery position.
  • Any required consumer unit upgrades or remedial work on existing earthing arrangements are quoted distinctly.
  • Current labour rate: £70 per hour.
  • Materials, specialist equipment and larger project work are confirmed separately before they go ahead.

Battery storage installation across Canford Heath

We serve Canford Heath from our base in Poole.

Canford Heath EastCanford Heath WestAdastral RoadBH17

What happens on the day

Every installation is planned thoroughly so you know how the work proceeds, where equipment sits and how long power isolation will last.

  • Positioning and cable routingWe confirm the mounting surface for the battery pack and inverter, check ventilation clearances and lay floor protection along work paths before drilling or fixing enclosures.
  • Mounting and circuit connectionThe inverter and battery modules are fixed securely into position. We fit a dedicated rotary isolator, install new protective devices and run heavy-duty cabling neatly back to your distribution board.
  • Testing and control setupAfter briefly turning off the main power to finish the consumer unit connections, we complete electrical safety checks, energise the system and configure the monitoring controls so you can track storage levels.

How booking works

  1. Tell us about the job

    Tap Book Now and describe the work in the chat. Photos help.

  2. Get your price

    You see your price in the chat. A set price is paid at checkout; any other job is quoted first.

  3. Choose your visit

    Give your address and when you are free, and the visit is arranged.

Follow your job from booking to receipt

See when we're on our way, get your job report the moment we finish, and pay in seconds.

  • Track us on our way

    See us on the map with a live arrival time.

  • Your job report, same day

    See exactly what was done as soon as we finish.

  • Invoice and receipt in one place

    Pay online in seconds, and your receipt is always there when you need it.

Why choose MX2 Electrical

  • You see the price before you call

    Starting prices for the common jobs are published on this site, not held back until someone visits.

  • Registered work, certificated properly

    MX2 Electrical is NAPIT registered, and notifiable work is notified through that registration.

  • The fault gets found before the repair gets priced

    Testing establishes what is actually wrong rather than replacing parts in sequence.

Photo of Mohsen NazariMohsen NazariOwner
Reviews
101
Rating
4.9
Trading since
2024
“With over 20 years in the trade behind us, we are a fully qualified, NAPIT registered team covering Poole and the Dorset area, domestic and commercial. We turn up when we say we will, explain what needs doing before we do it, and leave the place as we found it.”

Mohsen Nazari, MX2 Electrical

Book Now

Photos of our work

Earth loop impedance readings taken during a landlord EICR
Electric shower replaced, with the supply and cable connections opened up
Waterfall chandelier hung over a kitchen island
Vent-Axia continuous running extract fan commissioned in a loft
EV charge point fitted beside a back door with its own isolator enclosure
Fox ESS EV charger installed with a weatherproof protective device box

Frequently asked questions about battery storage

Still have a question?

Can I install battery storage if I do not have solar panels?

Yes. Standalone battery units can be charged from the mains during cheap off-peak periods, such as overnight electric vehicle or heat pump tariffs. The stored power then runs your home during peak price hours, cutting daily electricity costs without requiring solar panels on the roof.

Where is the best place to put the battery unit?

Batteries are usually positioned in an attached garage, a ground-floor utility room or outside against a sturdy external wall. The location requires adequate ventilation, clearance from heat sources and a straightforward cable path back to your consumer unit.

How long does a standard battery installation take to complete?

Most domestic installations take between one and two days. The exact duration depends on the cable distance between the battery pack and your fuse board. Your household power is only switched off for a short period while making the final connections into the main board.

Do I need permission from the electricity network before the work starts?

Systems rated up to 3.68kW on a single phase typically operate under G98 rules, meaning we notify Scottish and Southern Electricity Networks within 28 days of commissioning. Larger systems require advance G99 approval from the network operator, which we organise on your behalf.

Will a home battery keep running during a grid power cut?

Standard grid-tied battery systems automatically disconnect during an outage to protect engineers working on external power lines. If you require backup electricity during power cuts, a dedicated emergency power supply switch and separate backup circuit must be specified during installation.

Book or ask a question

Calls answered 24/7