Battery storage installation in Wimborne Minster

For shops and offices in Wimborne Minster, MX2 Electrical completes battery storage installation and leaves every new circuit tested at the consumer unit.

Calls answered 24/7

  • 2 years trading

Battery storage installation pricing

Pricing for battery storage installations reflects the specific electrical requirements of your building and the hardware being fitted. Full project costs are confirmed before work begins.

From £2,500

Battery storage installation: from £2,500

Commercial battery storage installation: from £18,000

Included in the installation

  • Assessment of your existing consumer unit, main earthing and electrical bonding
  • Installation of dedicated circuits, rotary isolators and protective devices
  • Mounting and wiring of the battery unit and compatible inverter
  • Running and securing cables between the battery, inverter and distribution board
  • Commissioning of battery operating settings and monitoring connections
  • Verification testing of earth loop impedance and protective devices
  • Submission of G98 or G99 paperwork to the distribution network operator

Ways to pay

  • Visa
  • Mastercard
  • American Express
  • Apple Pay
  • Google Pay
  • Klarna
  • Pay by bank
  • Bank transfer
  • Pricing depends on battery capacity, inverter type, and the distance between the battery and consumer unit.
  • Upgrades to main earthing, bonding or distribution boards are quoted clearly in advance if required.
  • Current labour rate: £70 per hour.
  • Materials, specialist equipment and larger project work are confirmed separately before they go ahead.

Battery storage installation across Wimborne Minster

We serve Wimborne Minster from our base in Poole.

Wimborne town centreLeigh RoadAllenviewBH21

What happens on the day

Every visit is planned to ensure battery hardware is mounted firmly, wired safely and tested thoroughly with minimal interruption to your power.

  • Preparation and position planningWe review the planned mounting area for the inverter and battery units, confirm the cable runs with you, and lay protective coverings across working areas before unpacking equipment.
  • Mounting and circuit wiringThe storage unit and inverter are secured to the structure. We run heavy-duty cabling back to your consumer unit, fitting dedicated protective devices and a rotary isolator switch.
  • Commissioning and safety testingMains power is briefly turned off while we terminate the connections at the distribution board. We test earth loop impedance, verify device operation, and power up the system to configure settings.
  • System walkthrough and handoverWe walk you through system operation, explain isolation points, demonstrate monitoring features, clear away all packaging and prepare the compliance certificates.

How booking works

  1. Tell us about the job

    Tap Book Now and describe the work in the chat. Photos help.

  2. Get your price

    You see your price in the chat. A set price is paid at checkout; any other job is quoted first.

  3. Choose your visit

    Give your address and when you are free, and the visit is arranged.

Follow your job from booking to receipt

See when we're on our way, get your job report the moment we finish, and pay in seconds.

  • Track us on our way

    See us on the map with a live arrival time.

  • Your job report, same day

    See exactly what was done as soon as we finish.

  • Invoice and receipt in one place

    Pay online in seconds, and your receipt is always there when you need it.

Why choose MX2 Electrical

  • You see the price before you call

    Starting prices for the common jobs are published on this site, not held back until someone visits.

  • Registered work, certificated properly

    MX2 Electrical is NAPIT registered, and notifiable work is notified through that registration.

  • The fault gets found before the repair gets priced

    Testing establishes what is actually wrong rather than replacing parts in sequence.

Photo of Mohsen NazariMohsen NazariOwner
Reviews
101
Rating
4.9
Trading since
2024
“With over 20 years in the trade behind us, we are a fully qualified, NAPIT registered team covering Poole and the Dorset area, domestic and commercial. We turn up when we say we will, explain what needs doing before we do it, and leave the place as we found it.”

Mohsen Nazari, MX2 Electrical

Book Now

Photos of our work

Two vertical outdoor wall lights illuminating a front entrance at dusk
Outdoor bollard lights and garden spotlights illuminating a curved driveway and planted border
Row of outdoor bollard lights illuminating a driveway beside a slatted boundary fence
Outdoor bollard lights illuminating a driveway beside a hedge and entrance gate
Old wired fuse board replaced with a new metal consumer unit
Earth loop impedance readings taken during a landlord EICR

Frequently asked questions about battery storage

Still have a question?

Can I install battery storage without solar panels?

Yes. Standalone battery storage systems can be charged directly from the grid overnight using cheaper off peak electricity tariffs. The stored power is then used during peak daytime hours to run domestic appliances, reducing your overall energy costs.

Where can a battery storage system be located?

Batteries and inverters are typically positioned in an attached garage, a ground floor utility room or a loft space, provided structural support and ventilation are suitable. Weatherproof units can also be mounted to an external brick wall.

How long does a typical installation take?

A domestic battery storage installation usually takes between one and two days, depending on cable runs and the position of your consumer unit. The main electrical supply is switched off only for a brief period during final board terminations.

Do you handle distribution network operator permissions?

Yes. Systems operating up to 3.68kW per phase fall under G98 rules, meaning we notify Scottish and Southern Electricity Networks within 28 days of commissioning. For larger systems requiring advance G99 approval, we submit the technical applications on your behalf.

Will my battery system provide backup power during a power cut?

Standard grid-tied battery systems shut down during a power cut to prevent electrical backfeed into the network. If backup power is required, an emergency power supply circuit and automatic islanding switchgear must be specifically designed into the installation.