Battery storage installation in Wimborne Minster
For shops and offices in Wimborne Minster, MX2 Electrical completes battery storage installation and leaves every new circuit tested at the consumer unit.
Calls answered 24/7
- 2 years trading
Battery storage installation pricing
Pricing for battery storage installations reflects the specific electrical requirements of your building and the hardware being fitted. Full project costs are confirmed before work begins.
From £2,500
Battery storage installation: from £2,500
Commercial battery storage installation: from £18,000
Included in the installation
- Assessment of your existing consumer unit, main earthing and electrical bonding
- Installation of dedicated circuits, rotary isolators and protective devices
- Mounting and wiring of the battery unit and compatible inverter
- Running and securing cables between the battery, inverter and distribution board
- Commissioning of battery operating settings and monitoring connections
- Verification testing of earth loop impedance and protective devices
- Submission of G98 or G99 paperwork to the distribution network operator
Ways to pay


- Pay by bank
- Bank transfer
- Pricing depends on battery capacity, inverter type, and the distance between the battery and consumer unit.
- Upgrades to main earthing, bonding or distribution boards are quoted clearly in advance if required.
- Current labour rate: £70 per hour.
- Materials, specialist equipment and larger project work are confirmed separately before they go ahead.
Battery storage installation across Wimborne Minster
We serve Wimborne Minster from our base in Poole.
What happens on the day
Every visit is planned to ensure battery hardware is mounted firmly, wired safely and tested thoroughly with minimal interruption to your power.
- Preparation and position planningWe review the planned mounting area for the inverter and battery units, confirm the cable runs with you, and lay protective coverings across working areas before unpacking equipment.
- Mounting and circuit wiringThe storage unit and inverter are secured to the structure. We run heavy-duty cabling back to your consumer unit, fitting dedicated protective devices and a rotary isolator switch.
- Commissioning and safety testingMains power is briefly turned off while we terminate the connections at the distribution board. We test earth loop impedance, verify device operation, and power up the system to configure settings.
- System walkthrough and handoverWe walk you through system operation, explain isolation points, demonstrate monitoring features, clear away all packaging and prepare the compliance certificates.
How booking works
Tell us about the job
Tap Book Now and describe the work in the chat. Photos help.
Get your price
You see your price in the chat. A set price is paid at checkout; any other job is quoted first.
Choose your visit
Give your address and when you are free, and the visit is arranged.
Follow your job from booking to receipt
See when we're on our way, get your job report the moment we finish, and pay in seconds.
Track us on our way
See us on the map with a live arrival time.
Your job report, same day
See exactly what was done as soon as we finish.
Invoice and receipt in one place
Pay online in seconds, and your receipt is always there when you need it.
Why choose MX2 Electrical
You see the price before you call
Starting prices for the common jobs are published on this site, not held back until someone visits.
Registered work, certificated properly
MX2 Electrical is NAPIT registered, and notifiable work is notified through that registration.
The fault gets found before the repair gets priced
Testing establishes what is actually wrong rather than replacing parts in sequence.
- Reviews
- 101
- Rating
- 4.9
- Trading since
- 2024
“With over 20 years in the trade behind us, we are a fully qualified, NAPIT registered team covering Poole and the Dorset area, domestic and commercial. We turn up when we say we will, explain what needs doing before we do it, and leave the place as we found it.”
Mohsen Nazari, MX2 Electrical
Book NowPhotos of our work
Can I install battery storage without solar panels?
Yes. Standalone battery storage systems can be charged directly from the grid overnight using cheaper off peak electricity tariffs. The stored power is then used during peak daytime hours to run domestic appliances, reducing your overall energy costs.
Where can a battery storage system be located?
Batteries and inverters are typically positioned in an attached garage, a ground floor utility room or a loft space, provided structural support and ventilation are suitable. Weatherproof units can also be mounted to an external brick wall.
How long does a typical installation take?
A domestic battery storage installation usually takes between one and two days, depending on cable runs and the position of your consumer unit. The main electrical supply is switched off only for a brief period during final board terminations.
Do you handle distribution network operator permissions?
Yes. Systems operating up to 3.68kW per phase fall under G98 rules, meaning we notify Scottish and Southern Electricity Networks within 28 days of commissioning. For larger systems requiring advance G99 approval, we submit the technical applications on your behalf.
Will my battery system provide backup power during a power cut?
Standard grid-tied battery systems shut down during a power cut to prevent electrical backfeed into the network. If backup power is required, an emergency power supply circuit and automatic islanding switchgear must be specifically designed into the installation.
