Battery storage installation in Ferndown
Businesses in Ferndown get MX2 Electrical battery storage installation, including a tested link into the consumer unit with its own protection.
Calls answered 24/7
- 2 years trading
Battery storage installation pricing
Battery storage installations do not carry a single fixed price because equipment capacity and cable requirements differ between properties. We assess your installation and provide clear written costs before any work starts.
From £2,500
Battery storage installation: from £2,500
Commercial battery storage installation: from £18,000
Included in the installation
- Assessment of your existing consumer unit, main earthing and electrical bonding
- Installation of dedicated circuits, rotary isolators and protective devices
- Mounting and wiring of the battery unit and compatible inverter
- Running and securing cables between the battery, inverter and distribution board
- Commissioning of battery operating settings and monitoring connections
- Verification testing of earth loop impedance and protective devices
- Submission of G98 or G99 paperwork to the distribution network operator
Ways to pay


- Pay by bank
- Bank transfer
- The overall price depends on the storage capacity of the battery bank and whether single-phase or three-phase equipment is required.
- Longer cable runs between your consumer unit and the battery location require additional materials and installation time.
- Existing consumer units that require updated protective devices or board replacement will adjust the final quotation.
- Current labour rate: £70 per hour.
- Materials, specialist equipment and larger project work are confirmed separately before they go ahead.
Battery storage installation across Ferndown
We serve Ferndown from our base in Poole.
What happens on the day
We plan the installation around your property layout, keeping electrical interruption brief while the new protective equipment and cabling are connected.
- Mounting the equipmentThe battery enclosure and inverter are fixed securely in a garage, utility room or external wall location chosen for adequate ventilation and structural support.
- Dedicated circuit wiringHeavy-duty cabling is run from the battery unit and inverter back to your consumer unit through a dedicated rotary isolator and separate protective devices.
- Electrical connections and testingPower is turned off briefly to make the final connections at the consumer unit, followed by insulation resistance and earth fault loop impedance checks across the new circuit.
- System handover and demonstrationWe configure the operating parameters, verify monitoring connections, walk you through the isolation switches, and leave the working area clean and tidy.
How booking works
Tell us about the job
Tap Book Now and describe the work in the chat. Photos help.
Get your price
You see your price in the chat. A set price is paid at checkout; any other job is quoted first.
Choose your visit
Give your address and when you are free, and the visit is arranged.
Follow your job from booking to receipt
See when we're on our way, get your job report the moment we finish, and pay in seconds.
Track us on our way
See us on the map with a live arrival time.
Your job report, same day
See exactly what was done as soon as we finish.
Invoice and receipt in one place
Pay online in seconds, and your receipt is always there when you need it.
Why choose MX2 Electrical
You see the price before you call
Starting prices for the common jobs are published on this site, not held back until someone visits.
Registered work, certificated properly
MX2 Electrical is NAPIT registered, and notifiable work is notified through that registration.
The fault gets found before the repair gets priced
Testing establishes what is actually wrong rather than replacing parts in sequence.
- Reviews
- 101
- Rating
- 4.9
- Trading since
- 2024
“With over 20 years in the trade behind us, we are a fully qualified, NAPIT registered team covering Poole and the Dorset area, domestic and commercial. We turn up when we say we will, explain what needs doing before we do it, and leave the place as we found it.”
Mohsen Nazari, MX2 Electrical
Book NowPhotos of our work
Can I install battery storage without solar panels?
Yes. Battery storage systems can connect directly to your household consumer unit to charge from the mains grid overnight on cheaper off-peak electricity tariffs, then discharge stored power into your home during higher-rate daytime hours.
Where can the battery system be installed?
Batteries are usually positioned in a garage, utility room or sturdy outbuilding with adequate ventilation and wall or floor support. Certain weather-rated battery enclosures can also be mounted on an external building wall.
How long does a battery storage installation take?
Most domestic battery installations take between one and two days, depending on the distance and cable run back to your consumer unit. Mains electricity to the property is turned off for only a short period while making final connections.
Do you handle the grid connection permissions?
Yes. We complete and submit the required G98 or G99 paperwork to Scottish and Southern Electricity Networks, confirming that your energy storage equipment meets network connection regulations.
Will a battery system keep power on during a power cut?
Standard battery storage installations shut down during a grid power cut to prevent feeding power back into the public network. If backup power is needed during a power cut, an emergency power switch must be integrated into the installation.
